Even more work to report on now, as our contractor (Tim McKinnon) has been busy with a final push to wrap things up. Here are some quick notes since our last update:
- bathroom and kitchen cabinets installed, just waiting for kitchen counter;
- pressure tank and hot water heater installed;
- electrical fixtures and plumbing fixtures soon to be installed;
- doors and trim are on;
- loft and stair railing installed (look great with the black metal balusters);
- bathtub installed and tiled; and
- so much more (thanks Tim!)
Drop by anytime.
1 comment:
I am very impressed, can't wait to visit it next year. Keep posting pics. Especially when it is complete. L. MC
Post a Comment