Monday, 14 September 2009

A new look

Thanks to the generous help from Robert and Carolyn this past weekend, we were able to bring the painting up to about 90% complete. Particular thanks to Robert, for his tireless efforts of raising the roller above his head to paint the ceiling (no easy task when you work from stage).







Nearly there

Renovations are coming together nicely. Watch the videos: 1) loft view, and 2) guided tour.


Tuesday, 1 September 2009

Another update

Even more work to report on now, as our contractor (Tim McKinnon) has been busy with a final push to wrap things up. Here are some quick notes since our last update:

  • bathroom and kitchen cabinets installed, just waiting for kitchen counter;

  • pressure tank and hot water heater installed;

  • electrical fixtures and plumbing fixtures soon to be installed;
  • doors and trim are on;
  • loft and stair railing installed (look great with the black metal balusters);
  • bathtub installed and tiled; and
  • so much more (thanks Tim!)
Once Tim concludes his work, we will be busy with painting and other finish work, and hope to have everything wrapped up by October.


Drop by anytime.